Development Mine Scheduling Concept in Making Pit Design

##plugins.themes.academic_pro.article.main##

Dedi Yulhendra
Feraldo Sandrio
* Corresponding author: feraldosandrio@outlook.com
Adree Octova

Abstract

Planning a modern open pit mine requires a computer model of the resources and reserves to be mined, both block and grid models. With current technological developments and has entered almost all sectors including the mining sector, as for computer program packages (software) used by the mining industry, namely Microsoft excel, Mincom minescap and others. An evaluation and analysis system of mine plans/ mine schedules is necessary to make predictions of mining operations that will be carried out and can be used to find the cause of deviation or design deviations. There are several weaknesses in making scheduling manually, so scheduling is done using SPRY which is very helpful in the scheduling process.

##plugins.themes.academic_pro.article.details##

How to Cite
Yulhendra, D., Sandrio, F., & Octova, A. (2023). Development Mine Scheduling Concept in Making Pit Design. MOTIVECTION : Journal of Mechanical, Electrical and Industrial Engineering, 5(2), 269-282. https://doi.org/10.46574/motivection.v5i2.208

References

[1] B. Groeneveld, E. Topal, and B. Leenders, “Examining system configuration in an open pit mine design,” Resources Policy, vol. 63, p. 101438, Oct. 2019, doi: 10.1016/j.resourpol.2019.101438.
[2] M. Abdulai and M. Sharifzadeh, “Probability Methods for Stability Design of Open Pit Rock Slopes: An Overview,” Geosciences, vol. 11, no. 8, Art. no. 8, Aug. 2021, doi: 10.3390/geosciences11080319.
[3] A. Agosti, S. Utili, C. Valderrama, G. Albornoz, and P. M. Dight, “Optimal pitwall profiles to maximise the overall slope angle of open pit mines: the McLaughlin Mine,” Australian Centre for Geomechanics, Oct. 2021. doi: 10.36487/ACG_repo/2135_01.
[4] O. Laayati, M. Bouzi, and A. Chebak, “Smart Energy Management System: Design of a Monitoring and Peak Load Forecasting System for an Experimental Open-Pit Mine,” Applied System Innovation, vol. 5, no. 1, Art. no. 1, Feb. 2022, doi: 10.3390/asi5010018.
[5] M. Åstrand, M. Johansson, and A. Zanarini, “Underground mine scheduling of mobile machines using Constraint Programming and Large Neighborhood Search,” Computers & Operations Research, vol. 123, p. 105036, Nov. 2020, doi: 10.1016/j.cor.2020.105036.
[6] S. Huang, G. Li, E. Ben-Awuah, B. O. Afum, and N. Hu, “A robust mixed integer linear programming framework for underground cut-and-fill mining production scheduling,” International Journal of Mining, Reclamation and Environment, vol. 34, no. 6, pp. 397–414, Jul. 2020, doi: 10.1080/17480930.2019.1576576.
[7] “Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach | Operations Research.” https://pubsonline.informs.org/doi/abs/10.1287/opre.2019.1965 (accessed Mar. 18, 2023).
[8] A. Octova, M. Putri, and D. Yulhendra, “Estimation of Optimal Blasting Geometry Using Multivariate Modeling to Reduce Boulder Potential and Improve Mining Production,” Georest, vol. 1, no. 1, Art. no. 1, Sep. 2022, doi: 10.57265/georest.v1i1.3.
[9] I. Arif and G. S. Adisoma, “Buku Ajar TA 424-Perencanaan Tambang,” ITB. Bandung. Halaman, vol. 2, 2002.
[10] K. Matsui, T. Sasaoka, H. Shimada, J. T. Ueda, J. S. Kramadibrata, and B. Sulistianto, “Highwall mining systems at surface coal mines in Indonesia,” Colliery Guardian, vol. 256, pp. 28–31, May 2008.
[11] W. Hustrulid and M. Kuchta, “Open pit mine planning and design. Volume 1 - fundamentals,” Dec. 1995, Accessed: Mar. 15, 2023. [Online]. Available: https://www.osti.gov/etdeweb/biblio/159526
[12] D. Aswandi and D. Yulhendra, “Redesain Rancangan Ultimate Pit Dengan Menggunakan Software Minescape 4.118 Di Pit S41 PT. Energi Batu Hitam Kecamatan Muara Lawa & Siluq Ngurai, Kabupaten Kutai Barat, Kalimantan Timur,” Bina Tambang, vol. 4, no. 1, Art. no. 1, Mar. 2019, doi: 10.24036/bt.v4i1.103474.
[13] / Sugiyono | OPAC Perpustakaan Nasional RI., Metode Penelitian kuantitatif, kualitatif dan R & D. Bandung: Alfabeta, 2014.