Design and Development of a Special Service Tools Sliding Hammer for Removing Injector Nozzles on the SAA4D125E Diesel Engine

##plugins.themes.academic_pro.article.main##

Ari Aryadi
* Corresponding author: ari.aryadi@umj.ac.id
Reza Febriano Armas
Budi Utomo Wisesa

Abstract

This research focuses on designing a specialized tool called Special Service Tools Nozzle Attachment with a Sliding Hammer to remove injector nozzles in diesel engines. The fact that the long cycle time in the manual removal process of injector nozzles can be streamlined through this tool is emphasized. The researcher designed and developed this tool with the assistance of CAD. The research results show that by using this tool, the cycle time for removing injector nozzles can be reduced from 23 minutes to just 13 minutes. This indicates a significant improvement in work efficiency and productivity. This research has important implications for the industry, especially in the maintenance and repair of diesel engines.


Penelitian ini berfokus untuk merancang-bangun sebuah alat khusus yang disebut Special Service Tools Nozzel Attachment dengan Sliding Hammer untuk melepas injector nozzle pada mesin diesel. Fakta bahwa cycle time yang lama dalam pengerjaan proses pelepasan injector nozzle yang dilakukan secara manual diharapkan dapat di efisiensikan melalui alat ini. Peneliti merancang dan mengembangkan alat ini dengan bantuan CAD. Hasil penelitian menunjukkan bahwa dengan menggunakan alat ini, cycle time untuk melepas injector nozzle dapat ditekan dari 23 menit menjadi hanya 13 menit. Hal ini menunjukkan peningkatan yang signifikan dalam efisiensi waktu pengerjaan dan produktivitas hal ini memiliki implikasi penting dalam industri, terutama dalam perawatan dan perbaikan mesin diesel.

##plugins.themes.academic_pro.article.details##

How to Cite
Aryadi, A., Armas, R., & Wisesa, B. (2023). Design and Development of a Special Service Tools Sliding Hammer for Removing Injector Nozzles on the SAA4D125E Diesel Engine. MOTIVECTION : Journal of Mechanical, Electrical and Industrial Engineering, 5(3), 513-522. https://doi.org/10.46574/motivection.v5i3.265

References

[1] Denur, Denur, Dedi Dermawan, and Syafril Syafril. "Analisa Kerja Injector Terhadap Perfomance Engine pada Mesin Isuzu Cyz 51." JISI: Jurnal Integrasi Sistem Industri 3.2 (2017).
[2] Padang Yanuar, Ampala Khoryanton, Gio Oktariza. Rancang Bangun Alat Uji Injektor Nozzle Spray Semi Otomatis, Jurnal Rekayasa Mesin, Vol.14, No.2, Agustus 2021, hal 279-285.
[3] Komatsu, Service Tool Guide: Cylinder Head. PT. United Tractors Tbk., 2011.
[4] Purwono, Hendro, Thomas Djunaedi, and Dicky Adriansyah. "PEMBUATAN ALAT BANTU KHUSUS PEMASANG DAN PELURUS DISC CLUTCH PADA UNIT DUMP TRUCK HINO FM 260 JD." Prosiding Semnastek (2021).
[5] Abadi, Agus Haris, and Azhis Sholeh Buchori. "DESIGN OF SPECIAL SERVICE TOOLS (SST) MOTORCYCLE TIMING GEAR." Journal of Mechanical Engineering Education 8.2: 22-30.
[6] Abrar, Ali, and Steven Hadi. "RANCANG BANGUN SPECIAL TOOL VALVE SPRING PUSHER PADA CYLINDER HEAD ENGINE DENGAN PENGGERAK MOTOR DC." PROSIDING SNITT POLTEKBA 5 (2021): 169-173.
[7] Rasma, Ari Aryadi. "Pembuatan Alat Remove dan Install Track Roller Pada Unit PC 200-8MO untuk General Over Haul." Prosiding Semnastek (2022).
[8] Yoshimura, Masataka, “System design optimization for product manufacturing.” Springer Science & Business Media, 2010.
[9] Insano, Surya, and Heru Santoso Budi Rochardjo. "Optimasi Desain Struktur Train Nose Frame dengan Finite Element Analysis." KONSTELASI: Konvergensi Teknologi dan Sistem Informasi 3.1 (2023): 73-84.
[10] Al Aziz, Abdurrahman. "Perancangan Special Service Tool Coil Spring Compression Electric Untuk Shock Macpherson Strut Menggunakan Metode Eksperimen." Seminar Nasional Inovasi Vokasi. Vol. 2. 2023.
[11] Kristianto, Stevanus Brian, Yohanes P. Agung Purwoko, and Andreas Edi Widyartono. "RANCANG BANGUN ALAT BANTU PEMASANGAN SPRING PISTON BRAKE NO 1 PADA AUTOMATIC TRANSAXLE DENGAN METODE PERANCANGAN FRENCH." Technologic 14.1 (2023).
[12] Purwono, H., Rasma, R., Armas, R. F., Ramadhan, M. I., & Ramadhan, A. (2023). Analisa Kebocoran Oli Pada Penggerak Akhir Unit Bulldozer Komatsu D85ESS-2. Suara Teknik: Jurnal Ilmiah, 14(1), 44-50.
[13] S. Sunardi, R. Lusiani, and A. Opera Fitra, “PENGARUH PACK CARBURIZING DAN KEKASARAN PERMUKAAN TERHADAP UMUR FATIK MATERIAL POROS BAJA S45C”, Journal Foundry, vol. 3, no. 2, pp. 7-12, Feb. 2022.
[14] Zulkarnain Fatoni, Sukarmansyah, PERENCANAAN ALAT BANTU UNTUK MEMASANG TORAK (PISTON INSTALLER), Jurnal Desiminasi Teknologi, Volume 6, Nomor 1, Januari 2018.
[15] Purwono, Hendro, Reza Febriano Armas, and Azka Riziq Mubarok. "PEMBUATAN ALAT BANTU KHUSUS PELEPASAN DAN PEMASANGAN PISTON SEAL CYLINDER HYDRAULIC UNIT EXCAVATOR PC200-8M0." Prosiding Semnastek (2022).